Draft POC
Surveys

To draft the Plan of Correction for a Deficiency from the Survey Details page, select the draft POC link for that Deficiency. Lextree will display the Draft Plan of Correction page.

Enter the Plan of Correction. Use the field’s text formatting as needed.

Enter the completion date for the Plan of Correction. This date references the Completion Date for CMS 3567.

Enter the POC status for internal tracking.